Land00088.pngCreating Landscape Area Schedules

Preformatted schedules are available to report landscape area information for your file.

To create landscape area schedules:

  1. Select Tools > Reports > Choose Schedule.

  2. The Choose Schedule dialog box opens.

  3. Select a schedule, and click the drawing area to place it. If you select the hydrozone or water budget schedule, the Hydrozone record format is also added.

  4.     Landscape Area-Mass Planting (with or without images) lists the area names and sizes, and the names, percentages, and spacing of each type of plant in the area

        Landscape Area-Hydrozone Information lists general hydrozone information about each area

        Landscape Area-Water Budget lists plant type, plant factor, maximum water allowance, and estimated water use for each area

  5. If you selected the hydrozone or water budget schedule, attach hydrozone data to each landscape area.

  6.     Select a landscape area, and then from the Object Info palette, click the Data tab.

        Click Attach Record. From the Resource Selector, double-click the Hydrozone record format to apply it. The fields for the record format display below the Detach Record button.

        Enter the appropriate value for each field.

  7. If you selected the hydrozone or water budget schedule, right-click (Windows) or Ctrl-click (Mac) the worksheet in the drawing, and select Recalculate from the context menu.

~~~~~~~~~~~~~~~~~~~~~~~~~

Creating Landscape Areas

Using Preformatted Schedules

Was this page helpful?

vectorworks.net