The VA Create Schedule command generates worksheets for the current file. Any schedule definitions that were created with the VA Records and Schedules command display in the list, as well as several pre-formatted schedules provided as default content with the Vectorworks Architect product.
The Display default content option must be selected on the Session tab of Vectorworks preferences to see the pre-formatted schedules. (See Session Preferences.)
Pre-formatted schedules include:
● Diffuser Report |
● Hardscapes Budget US |
● Plant List - Simple w/Images |
● Door Hardware Legend |
● Objects with IFC Entity |
● Plant List - Types |
● Door Schedule |
● Objects with IFC Entity - Specific |
● Plumbing Schedule |
● Door Schedule w/Images |
● Objects without IFC Entity |
● Roof Face Area |
● Drawing List |
● Plant List - Basic |
● Room Finish Schedule |
● Equipment Schedule |
● Plant List - Basic w/Images |
● Wall Area |
● Existing Tree Schedule |
● Plant List - Colors |
● Wall Style Report |
● Existing Tree Schedule w/Images |
● Plant List - Colors w/Images |
● Wall Style Report w/Images |
● Irrigation Head Schedule |
● Plant List - Costing |
● Window Schedule |
● Irrigation Line Schedule |
● Plant List - Costing w/Images |
● Window Schedule w/Image |
● Hardscapes Budget UK |
● Plant List - Simple |
● |
To generate a schedule:
1. Select Tools > Reports > VA Create Schedule.
The Create Schedule dialog box opens, listing the schedules that can be added to the file.
2. Select the desired schedule to be created. Enter a new Schedule Title if desired. Select Place worksheet on drawing to place the worksheet on the drawing for printing.
Each schedule has a record format associated with it. If there is a difference between the record definition currently in the file and the record definition in the current preference set, a notice displays with the option to continue or fix the record.
If the selected schedule already exists in the file, a warning dialog box opens. Select whether to replace or rename the new schedule (some schedules also have a recalculate option), and click OK.
4. Click on the drawing area where the top left corner of the schedule is to be located.
The worksheet opens, displaying the schedule information. If the option to place the worksheet on drawing was selected, the worksheet is included on the drawing.
If the “on drawing” worksheet is accidentally deleted, select the worksheet name from the Resource Browser and select Resources >Worksheet On Drawing.
~~~~~~~~~~~~~~~~~~~~~~~~~