DesignSeries00025.pngCreating Door Schedules or Worksheets

Users of the Vectorworks Architect product can add a door schedule to the drawing in two ways.

    Select Tools > Reports > Create Report, and select a pre-formatted schedule, as described in Using Preformatted Reports.

    From the Resource Manager, select Vectorworks Libraries\Defaults\Reports_Schedules\Architectural Reports.vwx. Drag the Door Schedule, Door Schedule w/Images, or Door Hardware Legend worksheet to the drawing. See Resource Manager.

The worksheet is populated with information from the door objects in the current drawing. To edit the worksheet after it has been created, see Editing Worksheets.

Users of the Vectorworks Landmark and Spotlight products can create a worksheet by creating a report for objects with a door record. To create the report from Landmark select Tools > Reports > Create Report; from Spotlight select Spotlight > Reports > Create Report.

~~~~~~~~~~~~~~~~~~~~~~~~~

Inserting Doors in Vectorworks Design Series

Door Properties

Moving Objects

Door Terminology Specific to the United Kingdom

 

Was this page helpful?