DesignSeries02719.pngCreating door schedules

Command

Workspace: Path

Create Report

Architect and Landmark: Tools > Reports

Spotlight: Spotlight > Reports

To create a door schedule:

Do one of the following:

Select the command, and then select a preformatted schedule, as described in Using preformatted reports.

Select the command, and then create a report for objects with a door record, as described in Creating reports.

The worksheet is populated with information from the door objects in the current drawing.

To edit the worksheet after it has been created, see Editing worksheets.

To place the worksheet on the drawing, see Placing a worksheet on the drawing.

If the doors have hardware sets, you can also add a door hardware legend to the drawing. Typically, the hardware set ID is included in the door schedule, and the hardware legend provides the details for each ID.

 

Was this page helpful?