Concept: BIM and Vectorworks
Difficulty level: Intermediate
BIM (Building Information Modeling) is the process of creating a model that can be used throughout the project's life cycle, from initial design concept, through construction, and into facility operations after project completion. When using a BIM process, you don't just design the project, or draw a plan, but build out a complete data environment to create a structured, object-based digital representation of a facility and/or site, including its physical components, functional characteristics, relationships, and project information. Essentially, a BIM model provides all the project's geometry and data in one place. Major advantages of BIM include more clear and accurate coordination among design team members, greater quality control, a more efficient and cost effective construction process, and improved facility/site operations and asset management. Vectorworks offers many features that support a complete BIM process.

This residential project was designed using BIM for the building and site modeling and documentation
Vectorworks smart objects
Vectorworks uses smart objects to present an integrated BIM solution for building- and site-related projects. Rather than a collection of lines and shapes that represent building parts and areas of a site, you insert these smart objects, such as walls, doors and windows, furniture and equipment, and plants, landscape areas and site modifiers. Benefits of smart objects include:
Each object knows what it is, where it is and how it relates to other objects in the model. For example, doors and windows know not only that they're inserted into walls, but which walls they're in. The walls know both where they are in the model, and that they need to create openings that accommodate the doors and windows. Plants know what kind of plant they are, and landscape areas know which plants are included in what proportions. When space objects are associated with walls, they update automatically if the walls move; spaces can also contain and report on a wide variety of data, such as area and volume, space number, occupancy, and room finishes.
Smart objects also know what data, such as manufacturer/vendor, model number, materials, performance characteristics, etc., are associated with them. Smart annotation objects such as data tags and graphic legends can display this data and update automatically when the referenced objects change.
Plug-in object styles and symbol definitions provide efficient and consistent management of the geometry and data of multiple identical and similar objects in a large project.
Smart objects' data can be reported in a variety of schedules and reports directly from the objects, using Vectorworks worksheets. Vectorworks includes many preformatted reports, and you can also create custom schedules and reports. These reports are easily updated any time the source objects change.
Insert smart objects using dedicated tools and commands, or easily convert 2D objects such as lines and shapes into many kinds of smart objects to transition from a 2D to BIM workflow.
Smart objects appear as traditional 2D objects in Top/Plan view, and as a full 3D model in 3D views.
This integrated solution means any changes to a smart object update not only the 3D model itself, but also the annotations such as data tags and graphic legends, the viewports that show that part of the model, and the schedules/reports that are part of the project's documentation. See the help sections titled Planning, Designing buildings, Designing landscapes, and Annotation (in the Documentation section) for information about using the smart objects most often used in BIM models.

Using the Vectorworks file structure to reinforce BIM workflows
You can use the Vectorworks file structure to support the geometry and 3D modeling of a BIM project, positioning objects in the proper physical relationship to each other, with story stacked on top of story, and roofs supported from below by columns and beams. On sites, objects such as curbs and hardscapes can help shape the site model.
For an example of how the file structure can reinforce BIM workflows, when modeling a multiple-story building, use design layers and stories with relative elevations and wall heights to stack the stories for an accurate model. A three-story building might use a total of four design layers: one for each story and one for the roof; it may be set up like this:
|
Floor/Story |
Design Layer |
Elevation |
Wall Height |
|
First Floor |
Design Layer-1 |
0'-0" |
10'-0" |
|
Second Floor |
Design Layer-2 |
10'-0" |
10'-0" |
|
Third Floor |
Design Layer-3 |
20'-0" |
10'-0" |
|
Roof |
Design Layer-4 |
30'-0" |
0" |
The same building may also be represented using four different stories. Stories provide more flexibility to associate different levels of associated objects, such as finish floor slabs, ceilings, and undersides of floors above contained within the building story. Multiple design layers can be included in a single story and adjust automatically when the elevation offset is altered.

Managing and reporting data
As noted, a BIM project provides the geometry and data together in the model, embedded in the same objects. For example, a door can know its size and manufacturer information, but also what materials it's made of, its IFC classification, and its fire rating and energy efficiency values. Having so much data available means you need a way to manage the data accurately and efficiently. The Object Info palette displays much of this data for a selected object, whether in the object itself or attached to it using a record format, on the Shape and Data tabs. The Data Manager is, as the name suggests, the central hub that controls which data fields are attached to objects in the model, as well as how data is displayed and entered on the Data tab of the Object Info palette. You can use data mapping to determine which data is added to which objects, as they are created or added to a model (by strategic class assignments, among other methods), as the model progresses through design development to final construction documentation, and beyond into operations after construction is complete. The Data Manager is a powerful tool for efficiently managing the full range of data needed in a BIM project.
A variety of annotations, reports, and schedules accurately reports the data attached to the smart objects in a model. Annotation objects such as data tags, elevation benchmarks, graphic, legends, and data legends display details about each object directly in the drawing area or viewports, and update to reflect changes to the referenced objects. Preformatted and customized reports provide information needed by stakeholders throughout the project life cycle, such as wall, roof, and room finish schedules, material take-offs, budgets, site model cut/fill reports, landscape area water budgets, title block revision history, and much more. Worksheets containing these reports share two-way communication with the objects they report on; they can reflect changes in the model, and you can use the worksheets to make global changes to symbol and plug-in object record information, as well as IFC data. Worksheets can be placed in drawings and on viewports, and they can be exported to share with others.


Collaboration across disciplines
Vectorworks supports collaboration among architectural, MEP, structural, site/civil, landscape, and other engineering and related disciplines through use of open BIM standards such as IFC, BCF, IDS, and ISO. These standards mean firms using different software tools can exchange information reliably. A BIM execution plan for the entire design team established at the start of a project ensures that each team member accurately provides the information required, uses the same classification systems, and so on.
You can export projects to IFC format for easy and accurate sharing. The BCF/issue management workflow lets collaborators review and manage issues directly in the BCF Manager, and syncs the issues to the BCF server for ease of collaboration. Each discipline involved with a project creates its own discipline model, which can then be combined into a federated BIM model that contains both geometry and data for coordination, model checking for clash detection, and issue resolution across all disciplines.